May 14, 2021
Elevator
- (3 hours)
Category: Empennage
Formed leading edge of elevator skins using PVC pipe per the plans. Laid out and riveted ribs to trim tab and clecoed skin in prep for riveting. Cut hinge stock in prep for measuring and mounting hinges on trim tab/elevator.